Train Station Houten

Scheuten Absoluut Glastechniek supplied and installed the glazing for the expansion of the station in Houten at the instructions of Strukton and Van de Bersselaar steel structures.

SAGT supplied and installed 2,856 m2 acoustic barriers with rubber profiles, 67 m2 lift glazing and 684 m2 platform roof glazing. In 2010, SAGT will fit the screens in the steel structures that have been constructed by the supplier.

Used products: Multisafe®
Back to overview
 
22-05-2013
Scheuten starts work on the installation and assembly of the glass Sphinx at the Kop van Weerd
More information
15-03-2013
Netherlands Competition Authority (NMa) decides to reduce the fine imposed to Scheuten in the past.
More information
06-12-2012
Scheuten to engineer noise barriers along east section of A10